Services Provided
Raw Water Quality Characterization and Testing
Water Treatment Process Treatability Testing
Pilot System Design, Operation and Evaluation
Water Treatment Plant Siting Studies
Water Treatment System Conceptual, Preliminary, and Detailed Design
Construction Administration and Inspection
Regulatory Approvals and Tendering Assistance
Commissioning, Operator Training, Operational Assistance

|
Recent Potable Water Projects
3.4 MGD surface water plant, Phase 2 – operational June 2003, Yarmouth, NS
1.5 MGD surface water treatment plant – operational June 2002, Windsor, NS
J.D. Kline water treatment plant corrosion control system upgrading – operational June 2002, Halifax Regional Water Commission, NS
Phase 2 wellfield and transmission main – operational August 2003, Happy Valley-Goose Bay, NL
4.0 MGD surface water treatment plant – operational December 2002, Bridgewater, NS
3.0 MGD surface water treatment plant – operational August 2000, New Glasgow, NS
2.0 MGD surface water treatment plant, Phase 1 – operational July 1998, Yarmouth, NS
1.5 MGD surface water treatment plant – operational July 1996, Port Hawkesbury, NS |